Data Center Operations Dashboard
Real-time facility monitoring with AI-powered recommendations
Annual Savings Potential
$247,500
AI-driven cost optimization across facilities
Carbon Reduction
-18.5%
Year-over-year emissions decrease
Facilities Monitored
3
Active data centers under management
Consumption
13.0 MW
Capacity:10.4 MW
Utilization:124.8%
PUE
1.419
Industry Avg:1.58
25% Better than average
Lower is better
Avg Temperature
68.7°F
Optimal Range:68-75°F
Within optimal range
Server Capacity
28,656
Active Servers:26,840
Utilization:93.7%
Critical Alerts - Action Required
Immediate attention needed
2 Critical Issues
Temperature Alert
CRITICALRack-B1-07 temperature at 82°F, exceeding safe threshold
Current:82°F|Max:75°F
PDU Overload
HIGHPDU-A1-03 at 92% capacity, load redistribution needed
Load:92%|Current:31.2A
Infrastructure Health
Detailed system monitoring
4 Systems Online
Power Systems
Grid Utilization124.8%
13.0MW / 10.4MW capacity
Current PUE
1.419
25% Better
vs Industry
Cooling Systems
CRAC Units Active21/23
Avg Temperature
68.7°F
Optimal
68-75°F
Network
Uptime
99.98%
All switches operational
Zero packet loss detected
Compute
Server Utilization93.7%
26,840 / 28,656 servers
Total Racks
269
Zone Status
Infrastructure overview by zone
15 Zones Active
Zone A-1
6 ROWS
OPERATIONAL
RACKS
72
SERVERS
842/864
POWER LOAD
84%2.1MW / 2.5MW capacity
TEMPERATURE
71.2°FOVERALL UTILIZATION84%
Zone A-2
5 ROWS
OPERATIONAL
RACKS
68
SERVERS
788/816
POWER LOAD
83%1.9MW / 2.3MW capacity
TEMPERATURE
72.8°FOVERALL UTILIZATION83%
Zone B-1
4 ROWS
MONITORING
RACKS
58
SERVERS
651/696
POWER LOAD
85%1.7MW / 2MW capacity
TEMPERATURE
73.4°FOVERALL UTILIZATION85%
Zone B-2
4 ROWS
OPERATIONAL
RACKS
50
SERVERS
566/600
POWER LOAD
84%1.6MW / 1.9MW capacity
TEMPERATURE
70.9°FOVERALL UTILIZATION84%
Real-Time Activity Stream
Live facility monitoring
2,847 events/min
UPS Battery Test Completed
EQUIPMENT17:26:40•UPS-10
Scheduled battery health check completed successfully.
Health:85%
Runtime:50min
Next Test:25d
Power Circuit Alert
ALERT17:26:40•PDU-05
PDU approaching current limit, load redistribution initiated.
Load:93%
Current:28A
Status:Rebalancing
UPS Battery Test Completed
EQUIPMENT17:26:40•UPS-04
Scheduled battery health check completed successfully.
Health:96%
Runtime:40min
Next Test:27d